A recent view of the widening and deepening project at Durban harbour, where the north breakwater has been rebuilt approximately 100m further north of its old location providing a much wider entrance channel of 222m width and a maximum depth of 19m shallowing to 16m inside the harbour. Construction and dredging is due for completion by early 2010. Picture by Steve McCurrach
http://www.airserv.co.za/maritime.htm